Electrical Panel Upgrade Cost — 100A to 400A
Who this is for: For homeowners upgrading an electrical panel — especially before EV charger or heat pump installation.
Panel amperage, sub panel and rewiring in — upgrade cost range.
Quick answer: Electrical panel upgrade: 100A $800–1,500, 200A $1,500–3,000, 400A $2,500–4,500. Sub panel +40%, rewiring +60%. 200A is the standard for modern homes. Permit and inspection required.
Expected cost
$2,250
midpoint estimate
Quote range
$1,500–3,000
permits + inspection included
Power outage
4–6 hours
one workday
Panel upgrade (200A)$800–4,500 by size
Total range$1,500–3,000
Panel work is licensed-electrician territory everywhere — permit and inspection required, DIY voids insurance. Before upgrading for an EV charger: a load calculation may show a load-management device ($400–600) does the job instead.
200A is the modern standard — EV charger + heat pump + electric range coexist. Federal Pacific and Zinsco panels are fire hazards: replace on discovery regardless of symptoms.
Core facts
| 100A | $800–1,500 |
|---|---|
| 200A | $1,500–3,000 |
| 400A | $2,500–4,500 |
| Sub panel | +40% of base |
| Rewiring | +60% of base |
| Status | 2026 US industry averages compiled from HomeAdvisor, Angi, and contractor quotes. Estimates for budgeting — real quotes depend on location, materials, and job complexity. |
How much does an electrical panel upgrade cost?
Panel upgrade: 100A $800–1,500, 200A $1,500–3,000, 400A $2,500–4,500. Sub panel adds 40% of base cost. Rewiring adds 60%. A 200A upgrade with sub panel: $2,400–4,200. Panel upgrades are needed before EV chargers (240V circuit), heat pumps (high amperage), and major renovations. Permits and inspection are always required.
Common uses
- Budgeting a panel upgrade before EV charger or heat pump
- Checking electrician quotes
- Deciding 100A vs 200A vs 400A
- Understanding sub panel and rewiring costs
Frequently Asked Questions
How much does an electrical panel upgrade cost?
100A $800–1,500, 200A $1,500–3,000, 400A $2,500–4,500. Sub panel adds $600–1,200, rewiring adds $1,350–2,700. Permits and inspection are required and included in most quotes.
Do I need a 200A panel for an EV charger?
Not necessarily — if your panel has a spare 40–50A slot, a licensed electrician can add a Level 2 charger circuit. 200A is recommended for whole-home electrification (EV + heat pump + induction range).
How long does a panel upgrade take?
4–8 hours typically. Power is off for 4–6 hours. Permit inspection may add a day. Plan for a full day without electricity.
When should I upgrade my electrical panel?
Before: EV charger, heat pump, major renovation, or if you have a 60A–100A panel with frequent breaker trips. Also: Federal Pacific and Zinsco panels are fire hazards and should be replaced immediately.
Can I upgrade my own electrical panel?
Legally: only a licensed electrician can perform panel upgrades in most jurisdictions. Permit and inspection required. DIY electrical panel work is dangerous and will void insurance.
More Home systems
Related guides
- How Much Does Tree Removal CostThe 2026 answer by tree size — full table with stump, emergency and access adders.
- Solar Panel Payback GuideGross cost, incentives, and payback math — how to know if solar pencils for your roof.
- Window Replacement vs RepairWhen a $50 fix beats a $400 replacement — the draft, fog and rot decision tree.
- HVAC Replacement Timing GuideRepair or replace, the $5,000 rule, and the best season to buy.
- Fence Installation Cost GuideMaterial picks by goal (privacy, pets, curb appeal), height rules and the permit checklist.
- EV Charger Install GuideLevel 2 step by step: panel check, circuit run, permit, and what the electrician actually does.